Defence and Critical Infrastructure

From two false starts to a plan with decision gates: EKBA and EMEAT

Client
Greek consulting services firm
Status
In progress
Frameworks
EKBA, EMEAT, NCAGE, ISO/IEC 27001, ISO 22301
~50%of EKBA already covered

The challenge

The EKBA clearance project had started twice without reaching implementation. It did not stall for technical reasons: there was no appointed owner, no phased contract and no recorded decisions.

What we did

  • An executive summary with specific decisions for management
  • Mapping of the existing ISO systems to the EKBA articles
  • EMEAT and the NCAGE code in parallel, for a tangible result before the clearance

What changed

  • About half of the EKBA requirements were found to be already covered at the level of policies and procedures
  • The real gaps were identified and each was assigned an owner
  • A project that had stalled twice now has a phased plan with decision gates

The next step